Cognitive Engineering & Self-Mastery — Part 4A: Attention Architecture for Complex Work
Share
Cognitive Engineering & Self-Mastery — Part 4A: Attention Architecture for Complex Work
Track: Work Graphs · WIP Limits · Attention Gates · 4C Loop · Reviews · Context Switch Audits
Attention is your only non-renewable currency during the day. Architect where it flows or entropy will spend it for you.
1) The Work Graph (Route Attention, Don’t Chase Tasks)
Model your work as a simple graph:
- Nodes: Projects, Tasks, Routines, Standards, Parking Lot.
- Edges: Dependencies (A→B), Cadence (weekly, monthly), and Gates (definition of ready/done).
- Views: Today (focus), This Week (commitments), Season (themes).
| Node | Type | Gate: Ready | Gate: Done |
|---|---|---|---|
| Book Chapter 2 | Project | Outline v1 + sources parked | 1,500 words + QA checklist |
| Newsletter | Routine | 3 bullets + hook | Sent + archive link |
| Design System | Standard | Component list | Tokens + docs merged |
2) WIP Limits (Keep the Lane Clear)
- Major initiatives: ≤ 3 active.
- Minor tracks: ≤ 5 active.
- Rule of One: one true priority per day; the rest support it.
3) Attention Gates (Permission to Start/Stop)
Before starting any block, pass two gates:
- Ready Gate: scope ≤ 90 minutes, first line written, assets available.
- Boundary Gate: timer set, notifications off, “First Line” visible.
Stop when one of these triggers fires: timer ends, quality dips twice, or dependency unmet.
4) The 4C Loop — Capture → Clarify → Compose → Calibrate
- Capture: inbox everything (notes, links, ideas) without judgement.
- Clarify: convert to next steps, attach to a node, add gate.
- Compose: build in peak blocks; protect via gates and WIP.
- Calibrate: review outcomes; re-route attention for tomorrow.
5) Context Switching Audit (Find the Leaks)
- Count switches/hour for one day. Aim ≤ 4/hr outside deep work, ≤ 1/hr during deep work.
- Batch communications into two windows; pre-write fast replies.
- Single-tab rule in peak blocks; new idea → capture, not click.
6) Deep Work Contracts (Make Focus Visible)
- Start ritual: breath ×1 min, First Line, 90-minute timer.
- No-novelty clause: no new tabs/apps; capture instead.
- Outcome receipt: export artifact link + 3-sentence summary.
7) Review Cadence (Daily → Weekly → Monthly)
- Daily (5 min): mark done, move blockers, pick One Thing.
- Weekly (30–45 min): WIP check, dependency fix, schedule peaks.
- Monthly (60–90 min): theme health, kill/continue/scale decisions.
8) Environment & Cues (Design the Room)
- Two modes only: build desk (clean, horizon gaze) and plan desk (calendar, boards).
- Soundtrack per project; scent as on/off switch; phone in another room.
Templates (Copy/Paste)
Work Graph Canvas
SEASON THEME: ______________________ MONTH: ___________ MAJOR (≤3): 1) ______ 2) ______ 3) ______ MINOR (≤5): 1) ______ 2) ______ 3) ______ 4) ______ 5) ______ DEPENDENCIES: A → B: ____________ C → D: ____________ STANDARDS (quality gates): _____________________________
Attention Router (Today/Week)
ONE THING (7 words max): _______________________________ Peak 1 (90±20m): ________ Node: ______ Gate ready? Y/N Peak 2 (90±20m): ________ Node: ______ Gate ready? Y/N Comm Windows: __:__ and __:__ Batch list: ______________ Kill/Park candidates (WIP relief): ______________________
Deep Work Contract
Block: __:__–__:__ Location: ______ Distractions off? Y/N First Line: ____________________________________________ Rules: single-tab · capture, don’t click · outcome receipt Outcome (link): __________ Summary (3 lines): __________
Context Switch Log (1-Day Audit)
Hour → Switches: 09:00 ____ 10:00 ____ 11:00 ____ 12:00 ____ Deep work hours (≤1/hr)? Y/N Top triggers: ______________ Patch (batch/blocks/tool lock): __________________________
Weekly Review Script (30–45 min)
1) Score KPIs (below) 2) Reduce WIP 3) Fix dependencies 4) Schedule peaks 5) Choose One Thing for Mon/Tue Kill/Continue/Scale decisions: __________________________
KPIs (Attention & Throughput)
- Deep work hours: ≥ 8–12/week
- Context switches during deep work: ≤ 1/hr
- WIP within limits (3 major / 5 minor)
- Daily 4C loop completed: ≥ 5/7 days
- Weekly review done: 4/4 weeks
Seven-Day Attention Sprint
- D1: Draw your Work Graph; set WIP limits; pick One Thing.
- D2: Run a context switch audit for 1 day; patch.
- D3: Write three Deep Work Contracts; execute two.
- D4: Build Attention Router for the rest of the week.
- D5: Fix one dependency; kill or park one item.
- D6: Weekly review; schedule next week’s peaks.
- D7: Rest + monthly micro-review (30 min).
Free Execution Prompt — Attention Systems Architect (10-Year Proof)
Copy-ready prompt (AI as strategic partner)
You are my Attention Systems Architect (Part 4A).
Goal: build a Work Graph with WIP limits, attention gates, a 4C loop, and review cadence for complex work.
ASK FIRST:
1) List my current projects (major/minor) and any hard deadlines
2) My natural peak windows and weekly time constraints
3) Biggest blockers/dependencies in the last 14 days
4) Tools I already use (notes, tasks, calendar)
5) My “One Thing” for the next 48 hours
DO THIS:
1) Draft a Work Graph (projects, routines, standards) with Ready/Done gates and dependencies.
2) Propose WIP limits (≤3 major, ≤5 minor) and identify kill/park candidates.
3) Create an Attention Router plan for the next 7 days (two peak blocks/day + comm windows).
4) Write three Deep Work Contracts for my top nodes this week.
5) Design a 4C loop for daily execution (5–10 min) and a Weekly Review script (30–45 min).
6) Provide a 1-day Context Switch Log and patch recommendations.
7) Define KPIs (deep work hours, switches/hr, 4C adherence, review cadence).
OUTPUT / ARTIFACTS:
- Work Graph v0.x (text)
- WIP plan + kill/park list
- 7-day Attention Router
- 3 Deep Work Contracts
- Daily 4C loop + Weekly Review script
- Context Switch Log + patches
- KPI sheet with targets
EVIDENCE GRADING:
- High: ≥8 deep work hours/week; switches ≤1/hr in deep blocks; 4C ≥5/7; weekly review complete.
- Moderate: 6–7 deep hours; 4C 4/7.
- Low: below → reduce WIP, shorten blocks, move comms to windows, strengthen gates.
LINK-FORWARD:
Advance to Part 4B — Multiscale Planning: From Day Craft to Seasonal Strategy.
FAQ (Part 4A)
What if emergencies keep breaking my blocks?
Protect one “untouchable” block/day. Move comms to two windows. Use a short “contain & reschedule” script to avoid spillover.
How long should a deep block be?
Start at 50–60 minutes; expand to 90 ± 20 minutes once you can keep switches ≤ 1/hr.
How do I choose One Thing?
Pick the node with the highest leverage for the season theme. If ties exist, choose the one with a ready dependency chain.
Next: Part 4B — Multiscale Planning: From Day Craft to Seasonal Strategy.
Original Author: Festus Joe Addai — Founder of Made2MasterAI™ | Original Creator of AI Execution Systems™. This blog is part of the Made2MasterAI™ Execution Stack.
🧠 AI Processing Reality…
A Made2MasterAI™ Signature Element — reminding us that knowledge becomes power only when processed into action. Every framework, every practice here is built for execution, not abstraction.
Apply It Now (5 minutes)
- One action: What will you do in 5 minutes that reflects this essay? (write 1 sentence)
- When & where: If it’s [time] at [place], I will [action].
- Proof: Who will you show or tell? (name 1 person)
🧠 Free AI Coach Prompt (copy–paste)
You are my Micro-Action Coach. Based on this essay’s theme, ask me: 1) My 5-minute action, 2) Exact time/place, 3) A friction check (what could stop me? give a tiny fix), 4) A 3-question nightly reflection. Then generate a 3-day plan and a one-line identity cue I can repeat.
🧠 AI Processing Reality… Commit now, then come back tomorrow and log what changed.